Featured work

Underground utility projects built for the long haul

From municipal water mains, sewer rehab, force mains, to complex storm drainage, Inlet Construction delivers dependable infrastructure across Hampton Roads.

Work that keeps Hampton Roads moving

Every project calls for careful planning, capable crews, and a commitment to doing the work right. Explore a selection of the underground utility, drainage, and site-development work our team is built to handle.

Dahlia Dr construction work in Virginia Beach, Virginia

Sewer

Dahlia Dr

Virginia Beach, Virginia

Installation of a new sewer manhole on the existing sewer main to reroute the line out of the backyards of existing homes and address existing negative slopes. Install a new sewer line from the proposed manhole to an existing manhole located upstream of the pump station, including three storm drain crossings consisting of two 60-inch pipes and one 15-inch pipe. Construct an entrance road and remove one tree to provide and maintain access to the work area.

  • New sewer manhole installation
  • New sewer line
Chesapeake Storm Drain construction work in Chesapeake, Virginia

Storm drainage

Chesapeake Storm Drain

Chesapeake, Virginia

Installation of approximately 870 LF of 12-inch to 27-inch RCP storm drain pipe across four separate locations. Work includes excavation, pipe installation, and backfilling as required to complete the storm drain improvements.

  • Storm sewer pipe installation
  • Catch basins and inlet structures
  • Outfall and site restoration
Rodgers St construction work in Hampton Roads, Virginia

Sewer

Rodgers St

Hampton Roads, Virginia

Installed approximately 344 LF of new 10-inch gravity sewer between two existing manholes. Reconnected existing sewer laterals and extended new laterals to the right-of-way line of each property as required. Replaced all pavement, curb, gutter, and sidewalk impacted by the installation.

  • Sewer utility installation
Deep Creek construction work in Chesapeake, Virginia

Water & Sewer

Deep Creek

Chesapeake, Virginia

Deep Creek Bridge Replacement included utility relocations. The utility work consisted of relocating approximately 520 LF of 8-inch, 150 LF of 24-inch, and 140 LF of 6-inch watermain, installation of a 24-inch x 8-inch tapping sleeve and valve, abandonment of existing watermains, relocation of approximately 120 LF of 6-inch City force main, adjustment of manhole castings and valve boxes, 3 water service connections and 3 reconnections, and 2 sewer laterals.

  • Watermain relocation
  • Force main relocation
  • Service connections & laterals
Timberlake Shopping Center construction work in Hampton Roads, Virginia

Sewer

Timberlake Shopping Center

Hampton Roads, Virginia

Completed the installation of a new sanitary sewer system consisting of one doghouse manhole and four new precast manholes. Work included installing approximately 822 LF of 8-inch and 10-inch SDR26 sewer pipe, along with new laterals, cleanouts, manhole frames and covers, and rain-stoppers. Upon completion, the existing sewer system was abandoned and flowable filled.

  • Sanitary sewer installation
  • Manhole installation
  • System abandonment
Lincoln Ave construction work in Hampton Roads, Virginia

Sewer

Lincoln Ave

Hampton Roads, Virginia

Completed installation, testing, and operation of the temporary bypass pumping system to maintain existing sanitary sewer flows. Cleared and stabilized access to MH 004-224, replaced the existing manhole, and performed the required sanitary sewer point repair. Completed CCTV inspections and CIPP lining of the designated gravity sewer segments.

  • Bypass pumping
  • Manhole replacement
  • CCTV inspection & CIPP lining
Harbor Ln construction work in Hampton Roads, Virginia

Sewer

Harbor Ln

Hampton Roads, Virginia

Completed the installation of approximately 1,045 LF of new 8-inch SDR26 PVC sanitary sewer pipe between existing manholes along Harbor Lane and Harbor Court, including the installation of one new manhole. Work included connecting existing sewer manholes, transferring existing services to the new sewer system, and installing new 4-inch PVC laterals with cleanout assemblies.

  • Sewer pipe installation
  • New manhole
  • Service lateral installation
Wythe Creek construction work in Hampton Roads, Virginia

Water

Wythe Creek

Hampton Roads, Virginia

Completed a total of 56 water service taps, including one 2-inch tap and 55 3/4-inch taps. All taps were completed to provide water service connections to the designated properties.

  • Water service taps
Margate Ave construction work in Hampton Roads, Virginia

Sewer

Margate Ave

Hampton Roads, Virginia

Performed the installation of approximately 885 LF of new sanitary sewer pipe, including 12-inch, 10-inch, and 8-inch PVC SDR26 pipe, along with four new concrete sanitary manholes. Existing sewer infrastructure was abandoned in place using flowable fill. Concrete alley way was replaced as removed for the installation of the new sewer main.

  • Sewer pipe installation
  • Manhole installation
  • Alley restoration